C=USCompliance analysis →

ISO/IEC 27001 mapped to the C=US architecture

ISO/IEC 27001:2022 sets the requirements for an information security management system (ISMS): a risk-based way to choose, run and improve security controls. This page goes through its management clauses (4 to 10) and the four themes of its Annex A controls, and for each one names what C=US has in the repository or on the pilot directory on cequs.com, and what is missing. ISO/IEC 27000:2026, the family’s overview, supplies the concepts used to read it.

Demonstrated built and exercised, with evidence in the repository Partial some of it exists, or it is built but not in use Not addressed nothing yet
The short answer

C=US is strongest where ISO 27001 is most technical: identity, access control, authentication, cryptography and secure development (Annex A themes 5.15–5.18 and 8). It is weakest where the standard is a management system: there is no defined ISMS scope, no information security policy, no Statement of Applicability, no internal audit and no management review.

Those are paperwork and process for one operator, not architecture. The architecture already does what the risk clauses ask of controls: an agent acts only under a dated grant checked on every request, and anything missing fails closed.

How the ISO concepts read onto C=US

ISO/IEC 27000:2026 (clause 4.1.5) sorts controls as preventive, detective or corrective, and says a mix of the three keeps a risk treatment plan working when one control fails. C=US has all three for agent misuse:

PreventiveHardware-attested enrollment, mTLS with the directory fingerprint, and a time-bounded grant (cequsAuthorizedScope, cequsGrantStart/cequsGrantEnd) checked by the gateway on every request.
DetectiveThe gateway’s signed decision log, verified in the browser; the live mTLS probe every 15 minutes; the MVP dashboard.
CorrectiveThe kill switch: the accountable person’s passkey stop, the administrator stop, and kill signals from other systems; certificate renewal.

The same overview (clause 4.1.4) says risks are not static and controls must be re-checked. On 22 November 2026 a seven-day gateway certificate expired and every agent was refused until it was renewed. The system failed closed as designed; the corrective action added that certificate to renew-all-agents.sh --gateway and published its expiry on the gateway’s status page (PRs #270, #272).

Clauses 4 to 10: the management system

ClauseWhat it asks, in shortC=US evidenceStatus
4.1–4.2Understand the context and the interested parties and their security requirementsMission and goals in PROJECT_GOALS.md. Interested parties are named on the home page (regulators, CISOs, developers, media) and in the interviews with producers and officials (interviews/).Partial
4.3–4.4Define the ISMS scope and establish the ISMSThe TEVV inventory lists components C1–C7 and trust boundaries TB1–TB7 (docs/tevv/00-inventory.md). No ISMS scope statement.Not addressed
5.1–5.2Leadership commitment and an information security policySECURITY.md is a vulnerability-reporting policy only. No overall information security policy.Not addressed
5.3Roles, responsibilities and authoritiesEach agent names an accountable person (cequsAccountableSponsor) who can stop it. Server, directory and CA changes are run by hand by the project lead.Partial
6.1.2A repeatable risk assessmentRisk register R01–R24 scored likelihood × impact (docs/tevv/02-risk-register.md); STRIDE threat model per trust boundary (06-threat-model.md).Demonstrated
6.1.3Risk treatment, compared with Annex A; a Statement of ApplicabilityResidual risk with recommended mitigations (05-residual-risk.md); acceptance needs the owner’s sign-off, none is assumed. This page is a first Annex A comparison; no Statement of Applicability.Partial
6.2Security objectives and plans to meet themGoals in PROJECT_GOALS.md; acceptance criteria for each defect in SOFTWARE_DEFECTS.md. Objectives are not measured.Partial
6.3Planned changesGovernance process for recursive-learning changes: feedback record, sign-off, linked commit with a passing acceptance test, journal entry, outcome check (governance/README.md).Demonstrated
7.1–7.3Resources, competence, awarenessA one-person pilot; competence is coursework. No training records.Not addressed
7.4Communicationsecurity@cequs.com, first response within 5 business days (SECURITY.md); the vulnerability response playbook (docs/security/vulnerability-response.md).Demonstrated
7.5Documented information, controlledEverything is in git with pull requests and CI; AI authorship recorded on each output (AGENTS.md).Demonstrated
8.1Operational planning and controlLDAP and gateway changes are rehearsed in WSL before they go live; deploy and LDAP scripts are run by hand, never as a side effect of a code change.Demonstrated
8.2–8.3Risk assessment and treatment carried out at intervalsRegister updated 2026-10-04 and 2026-10-20 (SSDF gap review); deep scan 2026-11-10 produced SEC-2026-11-10-01 to -12, all resolved. Not on a fixed schedule.Partial
9.1Monitoring, measurement, analysisLive mTLS probe every 15 minutes, five cases (deploy/mtls-probe/); signed gateway decision log; measured stop drills (≤ 316 ms, 2026-10-13); TEVV results (04-results.md). No alerting channel yet.Partial
9.2Internal auditRead-only server audit script (deploy/audit/server-audit.sh); an outside critique (control-plane critique); fuzzing and model-assisted scans. No audit programme.Partial
9.3Management reviewNo recorded review.Not addressed
10.1–10.2Continual improvement; nonconformity and corrective actionValidated defects in SOFTWARE_DEFECTS.md, each with an ID, evidence and acceptance criteria; the 22 November certificate lapse fixed in PRs #270 and #272.Demonstrated

Annex A: the four control themes

Annex A lists 93 reference controls in four themes. The rows below cover the controls C=US touches; numbers are ISO/IEC 27001:2022 Annex A.

Organizational (A.5)

ControlTopicC=US evidenceStatus
5.1Security policiesVulnerability-reporting policy only.Not addressed
5.2–5.3Roles; segregation of dutiesRegistration grants nothing; a separate dated grant does. LDIF from the registration page is reviewed and applied by an administrator. A two-person rule for fleet-wide stops is designed, not built (KILL-SWITCH.md, step 3).Partial
5.7Threat intelligenceReal incidents studied as cases (agent swarms, Amazon v. Perplexity). No feed.Partial
5.9Inventory of assetsComponent inventory (docs/tevv/00-inventory.md); key inventory (security/private-key-storage.md); the registered agents from signed records.Demonstrated
5.12–5.13Classification and labellingNo classification scheme.Not addressed
5.15Access controlThe gateway maps the verified certificate to a directory entry and checks status, scope and grant window, failing closed; browser-supplied names never establish identity.Demonstrated
5.16Identity managementAgent, person and organization entries in their state or organization’s part of the DIT under c=US (schema/cus-registry.schema).Demonstrated
5.17Authentication informationAgent keys made and kept in a TPM or YubiKey; directory administration by certificate only, no password login.Demonstrated
5.18Access rightsTime-bounded grants in cequsAuthorizationGrant entries, renewed on purpose (the farmer re-grant of 2026-11-23); removed by a stop or by status.Demonstrated
5.19–5.23Suppliers and cloud servicesDependencies on Cloudflare, DigitalOcean, Google Cloud and the model providers are drawn in the systemic dependency graph. No supplier security agreements.Partial
5.24–5.28Incident management and evidenceVulnerability response playbook with containment by stopping the agent; SEC- references; signed, timestamped decision records as evidence.Partial
5.29–5.30Continuity and ICT readinessEncrypted peer backups between cequs.com and the c=CA server are built and rehearsed, not installed; no restore drill yet (risk R24).Not addressed
5.31–5.34Legal requirements and privacyUtah AI Policy Act mapping; FAR 52.204-21 safeguarding requirements (governance/); minimal-disclosure answers and the duty of loyalty scenarios.Partial
5.35Independent reviewOutside critique, fuzzing (tools/sherpa/) and external scans. Not by an independent auditor.Partial
5.37Documented operating proceduresRunbooks beside each deploy script (deploy/*/README.md).Demonstrated

People (A.6)

ControlTopicC=US evidenceStatus
6.1–6.6Screening, terms, training, confidentialityOne operator. Identity proofing for people, which the design needs for accountable persons, is simulated.Not addressed
6.8Event reportingsecurity@cequs.com; the accountable person can stop their own agent with a passkey.Partial

Physical (A.7)

ControlTopicC=US evidenceStatus
7.1–7.8Secure areas and equipment sitingServers are hosted; physical controls are the provider’s.Partial
7.10, 7.14Storage media; disposalPrivate keys stay in hardware (TPM, YubiKey); the CA signer is in a YubiKey. Shredding of directory exports is an open item.Partial

Technological (A.8)

ControlTopicC=US evidenceStatus
8.1User endpoint devicesThe laptop that runs AI coding tools also holds root SSH to cequs.com (risk R23); each connection needs a YubiKey touch.Partial
8.2Privileged accessYubiKey-backed SSH; directory administration by a certificate on a separate YubiKey.Demonstrated
8.3Information access restrictionA read rule naming only root, the gateway and n8n is written and rehearsed (TEVV V5-05); the live directory still lets every bound user read the tree.Partial
8.4Access to source codePrivate repository; changes by pull request with CI.Demonstrated
8.5Secure authenticationmTLS with hardware attestation chained to pinned roots and the FIDO Metadata Service; WebAuthn with user verification required.Demonstrated
8.8Technical vulnerabilitiesDependabot; fuzzing; deep scans with every finding tracked to a fix. Deployed third-party servers are not scanned (risk R18).Partial
8.9Configuration managementHardening script with an automatic undo; read-only server audit. No proof of which code is deployed (risk R16).Partial
8.12Data leakage preventionCI safety lint blocks private keys and secrets in tracked files; minimal-disclosure answers.Partial
8.13Information backupPeer backups built, not installed (see 5.29).Not addressed
8.15LoggingSigned gateway decision log and attestation log. The directory server logs no binds or searches (risk R17).Partial
8.16Monitoring activitiesThe 15-minute mTLS probe and the live dashboard; no alerting.Partial
8.20–8.22Network security and segregationn8n and the evaluator in an isolated container network, published on loopback only; the public grading webhook refused (403).Demonstrated
8.24Use of cryptographyTLS 1.3 minimum; short-lived certificates; signed decisions; post-quantum mTLS tested.Demonstrated
8.25–8.29Secure development and testingCI on every pull request; TEVV test plan and results; NIST SSDF gap review; CI actions pinned to commit SHAs.Demonstrated
8.31Separation of environmentsA WSL directory and gateway test environment before live changes; development and administration share a laptop (R23).Partial
8.32Change managementPull requests, governance sign-off, WSL rehearsal. No automated rollback for gateway, n8n or directory changes (risk R15).Partial
8.33–8.34Test information; audit testingSynthetic test data; the server audit changes nothing.Demonstrated

What closing the gaps would take

Gaps, in order
  1. Write the ISMS frame: a scope statement built from the TEVV inventory, a one-page information security policy, and a Statement of Applicability that starts from the tables above.
  2. Install the peer backups and run a restore drill (A.5.29, A.8.13; risk R24).
  3. Turn on directory access logging for binds and searches (A.8.15; risk R17).
  4. Pick an alerting channel for the probe and for certificate expiry (A.8.16).
  5. Hold a dated management review of the risk register and residual risks, recording the owner’s acceptances (clauses 6.1.3, 9.3).

Sources

Drafted by Claude (Claude Code, Opus 5.5) on 2026-11-24 at the student’s request. The mapping and status ratings are AI-generated analysis, awaiting the student’s review; they are not a conformity assessment.